OVERVIEW
Total area: | 27,393 m2 |
Construction density: | 24.78% |
Number of apartments: | 4 Blocks of 1,229 units |
Apartment area: | 45 – 300 m2 (1 – 4 bedroom) |
Ownership: |
Long-term ownership for Vietnamese 50 years for foreigners |
The well-coordinated transportation infrastructure helps New City Thu Thiem residents significantly reduce travel time to central districts. From this location, it takes only about three minutes to reach Thu Thiem New Urban Area’s center, five minutes to downtown Thu Duc City, ten minutes to the center of Ho Chi Minh City, and twenty minutes to Tan Son Nhat International Airport.
Thanks to its prime location in the heart of Thu Thiem, New City Thu Thiem boasts exceptional value that increases daily with the development of the region. Positioned on Mai Chi Tho frontage road, the project also features excellent regional connectivity, including links to District 1 via the Thu Thiem Tunnel, the Long Thanh – Dau Giay expressway, and Thu Thiem Bridges 1 connecting to Binh Thanh and Thu Thiem Bridge 2 (Ba Son Bridge) to District 1.
Residents of New City Thu Thiem also enjoy access to external amenities within a 1km radius, including An Khanh primary school, Tran Dai Nghia high school for the gifted, hospitals and major shopping centers near the project.